Monday, November 24, 2008

The Hole

Just so as this job would not be easy I have found the new pool is about 150mm deeper than the old one so now to dig. The big problem being that nothing mechanical can get to the back of our place so this required the use of a shovel and barrow. I had to remove about 2.5 cubic metres of dirt not to mention about a further 1.5 cubic metres of sand now nicely heaped on the deck. The excess dirt had to be taken out through the back of the deck and barrowed over the bank at the back of the section. It's now all done so the next stage is the installation of the new pool, watch this space. Whew!!